Facility Enhancement Projects
The district is constantly making improvements to schools and non-educational facilities across the district. These projects maintain and enhance our facilities for our students, educators, and staff. Below is a list of locations and projects either in Planning, Design, or Construction occurring at those locations. Additionally, below the list of Active Projects is a list of recently Completed Projects.
Active Projects
-
Fire Alarm System Replacements
Installation of Basketball Shot Clocks
Installation of Bollards at Middle and High Schools
Installation of Room Numbers on Exterior Windows
-
Air Conditioning Replacement in the ESE Building
Board Room Upgrades
Cabling Upgrades (Buildings 1000/2000) with IDF Install
Emergency Replacement of Fire Alarm System
Fire Alarm System Replacement in the Facilities Building
-
Installation of additional parking spaces behind Professional Development
Installation of HVAC Package Units
-
HVAC Upgrades
Installation of Electical Outlets at the Front Desk
-
AHU Replacements
Hot water system redesign
-
AHU Replacements
Gym Speakers/Sound System Upgrade
Stadium Speakers/Sound System Upgrade
-
Air/Heating Unit Replacements
Cable Renovations
Fire Alarm System Replacement
-
HVAC Retrofit
-
Chiller Plant Retrofit
-
Baseball Field Renovations
-
HVAC Retrofit
-
Pump Room Retrofit
-
Kitchen and Serving Line Renovations
-
Pump Room Retrofits
Replace Marquee
-
Chiller Plant Retrofit
Replace Roof
Walk-In Refrigeration Unit Replacements
-
Exit Modifications
-
Additional Entrance Lane
-
Exit Lane Extension
-
Installation of New Circuits
Installation of New Shed
Reclaim Water Main Relcation
-
Chiller Plant Retrofit
-
Gymnasium A/C Replacement
-
Chiller Plant Retrofit
-
Installation of New Canopy
Installation of New Digital Radio Communication System
-
Installation of Card Reader and Associated Hardware
-
HVAC Replacement
-
Life/Safety Upgrades to comply with SREF and Building Code
-
Removal of Header
-
HVAC Replacement
-
AHU Replacements
FloWater Refill Stations
Football Field Scoreboard Replacement
HVAC Retrofits
Space reconfiguration for additional Office Space
-
HVA Retrofit
Installation of FloWater Refill Stations
-
Chiller Replacement
-
Additional Covered Lunch Seating
HVAC Redundancy Installation
-
Cafeteria Serving Line Renovations
-
Installation of a Canopy from Building 1 to Building 2
-
AHU Replacement
Installation of a second bathroom
Recently Completed Projects
-
Installation of Secure Lobbies at Facility Entrances
Installation of Video Intercoms at Facility Entrances
-
Building 1000 HVAC Installation/Upgrade
Building 2000 WH Freezers
-
Roof Replacement
-
Drainage Improvements adjacent to Bus Loop
-
Kitchen and Serving Line Renovations
Replacement of A/C Units
-
Resurface of the Shop Floor
-
Parking Lot Resurface/Paving and Striping
-
HVAC Retrofits
Installation of Flooring and Mirrors for the Dance Room
Parking Lot Resurfacing
-
Speaker System Replacement for Football Field
-
Space Reconfigurations
-
Central Energy Plant Retrofits
Softball Field Renovations
-
Network Cable Replacement
-
Left Turn Lane Extension and Installation of a Temporary Traffic Signal
-
Speaker System Replacement for Football Field
-
Replacement of Chiller Pumps and Re-Pipe
-
Installation of Rear Bus Loop
-
Parking Lot Resurfacing
-
Track Resurfacing
-
Reconfiguration of Walk-In Coolers and Freezers
-
Installation of ID Card Reader
-
Replacement of Gymnasium A/C Unit
-
Installation of new HVAC Controls
Rplacement of AHU Fan Coil Units in Building 7
-
Modification of Drop Off Area
Speaker System Replacement for Football Field
-
Installation of Magnetic Door Holds
-
Kitchen and Serving Line Renovations